                                                       RECORD STORAGE                       PART 2


After getting the frame parts ready,  assembly started and we soon had the rough rack done.



We made two identical 2 shelf units.   Wall mounting was next.   A support ledge was lag screwed to the wall, the completed frame was positioned on it and the top was anchored.    The second rack was installed above the lower one.


Then the dividers were installed and the trim nailed in place.


Some stain touch up and we were ready to start putting the records in place.


Of course, getting the records off of the floor and into the proper place alphabetically will involve a lot of work, but we are on the way.